Rooftop Solar MH

Sr.
Publishing Body
Circular / Regulation
Subject/ Title
Circular.No
Date
Document Link
1
MERC
Regulation
Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
No. MERC / Tech /Regulation/2019 /1234-
30/12/2019
2
Mahavitaran
Commercial Circular no-322
Connectivity to the Distribution network of MSEDCL for eligible consumers installing Roof top Renewable Energy Generating Systems in his premises under MERC (Grid Interactive Roof top Renewable Energy Generating Systems) Regulations, 2019------- Procedure for Application, methodology for Metering & Billing, etc.
CE/Comm/GIRREGS Regulations 2019/ No.02184
21/01/2020
3
Mahavitaran
Commercial Circular no-331
lmplementation of MNRE's Phase-ll of Grid Connected Rooftop Solar program in MSEDCL
CE/Comm/MNRE-RTS-Phase-II/No.01419
19/01/2021
4
Mahavitaran
Installation & Commissioning of grid connected rooftop Solar Photovoltaic systems in residential premises as per scope of work as per ALMM Specification
CE/SPD/2021/PHASE-II RTS/16753
24/06/2022
5
Mahavitaran
Authorization of AE(QC) of Subdivision Subdivision/Division offices having meter testing facility to test whole current meter and installation up to 20 KW under roof top scheme (RTS)
CE/Sp.Proj./MNRE-Phase-II RTS/No.21653
18/08/2022
6
Mahavitaran
Approval to Facilitate the Bulk Testing of meter for Roof top Solar
CE/Sp.Proj./MNRE-Phase-II RTS/No.21654
18/08/2022
7
Mahavitaran
Guidelines for effective Implementation of Simplification of Procedure for Rooftop, Solar Programme Ph-II for newly Launched National Portal.
CE(SPD)/ RTS/24904
23/09/2022
8
Mahavitaran
Consolidated Guidelines for procedure to be completed for applications registered on national Portal for Rooftop solar programme Ph-II
CE(SPD)/RTS/National Portal/03111
03/02/2023
9
Mahavitaran
Circular
Installation of Rooftop Solar in the Premises of Sugar Factories having EPA/PPA with MSEDCL for their Bagasse based congeneration plant.
RE/Rooftop/Cogen/No.08698
18/03/2024
10
Mahavitaran
Testing of rooftop solar net meters and Generation whole current meter and installation up to 20 KW at subdivision/ Division offices.
CE/PM KUSUM B/ No.20038
01/07/2024
11
Mahavitaran
Circular
Approval to grid connectivity of renewable Energy generating system connected behind the consumers meter for principle/Secondary consumers under MultiPartite agreement.
CE(SPD)/T/RTS/20946
05/07/2024
12
Mahavitaran
Auto approval (deemed approval) of Technical Feasibility up to 10 kWp for Roof Top Solar applications and auto approval for enhancement of load upto 10 KW after online payment of necessary charges.
No. CE (SPD)/RTS/TFR/20949
05/07/2024
13
Mahavitaran
Guidelines for installations of Roof Top Solar systems under PM SURYA GHAR: Muft Bijli Yojana.
CE(SPD)/RTS/21347
10/07/2024
14
Mahavitaran
Circular
Empanelment of vendors under the PM Surya Ghar: Muft Bijli Yojana
CE(SPD)/RTS/PBG/21576
12/07/2024
15
Mahavitaran
Circular
Technical feasibility study of rooftop solar PV systems above 10 KW within the period specified by electricity (rights of Consumers) Amendment Rules 2024
CE(SPD)/RTS/21912
16/07/2024
16
Mahavitaran
Guidelines for installations of Roof Top Solar systems under PM SURYA GHAR: Muft Bijli Yojana.
ED (Infra)/RTS/No.22603
24/07/2024
17
Mahavitaran
Go live of RTS Portal for vendor to upload documents and for employee for verification of uploaded documents regrading RTS installations under PMSG:MBY
ED (Infra) / RTS / No.33498
22/10/2024
18
Mahavitaran
Bulk Testing of Generation meter to be utilized for commissioning of RTS installation under PM Surya Ghar: Muft Bijli Yojana for accelerating progress under said scheme.
Ref.no.ED (Infra)/RTS/No.33590
23/10/2024
19
Mahavitaran
Division wise List of AMISP representative for installation of Solar Net meter.
ED (Infra)/RTS/No.33592
23/10/2024
20
Mahavitaran
Implementing " Facelwss and Paperless process" to accelerate progress of RTS installations under PMSG: MBY
ED (Infra)/RTS/No.34837
07/11/2024
21
Mahavitaran
Guidelines to install solar net meter by AMISP under PMSG: MBY
ED (Infra)/RTS/38699
13/12/2024
22
Mahavitaran
Guidelines for observing PV capacity (AC/DC) installed in accordance with connected/Sanctioned Load of prosumer for RTS installations.
ED (Infra)/RTS/No.00786
07/01/2025
23
Mahavitaran
Go live of RTS Vendor Portal Version-2 for Non-Subsidized Scheme
ED (Infra) / RTS / No.7125
03/03/2025
24
MSEDCL
Annexure-1
Procedure for Application for connectivity of Renewable Energy Generating System with MSEDCL’s Network
25
Mahavitaran
Document
Standard operating Procedure (SOP) for Installation & Commissioning of Rooftop solar System